• When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.

current turn around rates at CGC
80 80

26,945 posts in this topic

On 12/2/2021 at 12:31 PM, ToBeContinued... said:

How does this work with the different tiers and fast track?

My comment was only referencing the slow modern tier. In the past, some submissions would jump the line by 1 or 2 weeks, which is completely understandable. However, CGC needs to provide some sort of explanation why they've moved on to grading books received in August, while a bunch of ones received 2 months earlier are still sitting in limbo.

Link to comment
Share on other sites

On 12/2/2021 at 2:31 PM, GreatCaesarsGhost said:

I think part of the reason for the slowdown is all these celebrity signings. I was curious why on earth Ann Hathaway, but I see she played something somewhere. 
 

there’s a link to Ann’s “submission details”, but it yielded no interesting info

9AFF8469-5EDE-4EA7-8CEF-C03C817E8610.png

67A02075-0559-4AFD-AFB3-822A40ED1B3C.png

Most of these are not in-house CGC signings, but done corp partner facilitators...so they dont get the same turn around times as in-house.  Would be considered a convention submission.  Info should link to the facilitator web site for more info.

Link to comment
Share on other sites

On 12/2/2021 at 2:42 PM, IceHole said:

Most of these are not in-house CGC signings, but done corp partner facilitators...so they dont get the same turn around times as in-house.  Would be considered a convention submission.  Info should link to the facilitator web site for more info.

The Turtles signing will be very popular though...

Link to comment
Share on other sites

On 12/2/2021 at 2:06 PM, Chazgee said:

Did you get it pressed?

Yes, it sat doing nothing for a long time, then it finally went to CCS and then sat in GEI for the two months.  I won it in an auction here in 2017 and it was a cracked out 9.4.  I thought it was a weak 9.4, so that is why I had it pressed when I had it signed.  It is still a 9.4 so I am happy with that.

Link to comment
Share on other sites

Sampling of mine.  The June 14th has been in G/E/I since Sept 17

image.thumb.png.b9ee2e1daf60efb7fdc3b67b7169baad.png

The 10/25 actually arrived at CGC early in Sept. Part one went direct to shipped, never any other status. Part two was in received from 10/25 to 11/5 then direct to ship.

While I'm extremely glad to have those 10/25 books back, I would have greatly preferred if my June 14th received order stuck in G/E/I  was processed through - It's some seriously messed-up nonsense.

 

Edited by MAR1979
Link to comment
Share on other sites

On 12/1/2021 at 8:56 AM, CGC Mike said:

CGC has recently received a high volume of expedited packages.

= the rest of us are a nail-shaped or rod-shaped piece with a spiral groove and a slotted or recessed head designed to be inserted into material by rotating and used for fastening pieces of solid material together

Edited by joeypost
Link to comment
Share on other sites

Modern Slow Track (50 Books)
Delivered 05/04/21
Received 06/29/21
Scheduled For Grading 06/29/21
Grading/Encapsulation/Imaging 10/26/21

Modern Slow Track (50 Books)
Delivered 05/18/21
Received 07/21/21
Scheduled For Grading 07/21/21
Grading/Encapsulation/Imaging 11/11/21
Shipped 11/12/21

Modern Slow Track (50 Books)
Delivered 06/01/21
Received 08/03/21
Scheduled For Grading 08/03/21
Grading/Encapsulation/Imaging 12/01/21

Modern Slow Track (50 Books)
Delivered 06/09/21
Received 08/10/21
Scheduled For Grading 08/10/21
Grading/Encapsulation/Imaging 12/02/21

Modern Slow Track (50 Books)
Delivered 06/18/21
Received 08/17/21
Scheduled For Grading 08/17/21

Modern Slow Track (50 Books)
Delivered 06/29/21
Received 08/25/21
Scheduled For Grading 08/25/21

Modern Slow Track (50 Books)
Delivered 07/01/21
Received 08/26/21
Scheduled For Grading 08/26/21

Modern Slow Track (50 Books)
Delivered 07/16/21
Received 09/07/21
Scheduled For Grading 09/07/21

Modern Slow Track (50 Books)
Delivered 08/09/21
Received 09/20/21
Scheduled For Grading 09/20/21

Modern Slow Track (50 Books)
Delivered 08/13/21
Received 09/23/21
Scheduled For Grading 09/23/21

Modern Slow Track (50 Books)
Delivered 09/07/21
Received 10/07/21
Scheduled For Grading 10/07/21

Modern Slow Track (50 Books)
Delivered 09/20/21
Received 10/19/21
Scheduled For Grading 10/19/21

Modern Slow Track (50 Books)
Delivered 10/28/21
Received 11/01/21
Scheduled For Grading 11/01/21

Modern Slow Track (100 Books)
Delivered 11/18/21
Received 11/23/21
Scheduled For Grading 11/23/21

Link to comment
Share on other sites

On 12/2/2021 at 2:47 PM, joeypost said:

= the rest of us are a nail-shaped or rod-shaped piece with a spiral groove and a slotted or recessed head designed to be inserted into material by rotating and used for fastening pieces of solid material together

hm a vibrator ?

Link to comment
Share on other sites

Slow Track Modern + CCS

4/1 - Mailed to CGC 

4/9 - Delivered to CGC facility 

5/13~ - Received by CGC

5/13~ - Received by CCS

11/24 - CCS in Process

N/A - SFG

N/A - GEI

N/A - G/QC

N/A - Shipped

 

Fast Track Modern (No CCS)

11/22 - Mailed to CGC 

11/24 - Delivered to CGC facility

12/2 - Received by CGC

12/2 - SFG

N/A - GEI

N/A - G/QC

N/A - Shipped

Edited by qlow
Link to comment
Share on other sites

On 12/2/2021 at 1:09 PM, MAR1979 said:

Sampling of mine.  The June 14th has been in G/E/I since Sept 17

image.thumb.png.b9ee2e1daf60efb7fdc3b67b7169baad.png

The 10/25 actually arrived at CGC early in Sept. Part one went direct to shipped, never any other status. Part two was in received from 10/25 to 11/5 then direct to ship.

While I'm extremely glad to have those 10/25 books back, I would have greatly preferred if my June 14th received order stuck in G/E/I  was processed through - It's some seriously messed-up nonsense.

 

Yeah this is what I'm talking about. I have a slow modern shipment that was received 8/31 and it's still SFG and your submission slow modern like mine got received on 10/25 and it got shipped already.  This is definitely not first come first serve.

Link to comment
Share on other sites

On 12/2/2021 at 6:25 PM, Kantankerous said:

Yeah this is what I'm talking about. I have a slow modern shipment that was received 8/31 and it's still SFG and your submission slow modern like mine got received on 10/25 and it got shipped already.  This is definitely not first come first serve.

I believe their new process is akin to throwing a dart blind-folded.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
80 80