-
When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
-
Posts
786 -
Joined
-
Last visited
Content Type
Forums
CGC Journals
Gallery
Events
Store
Posts posted by Praxis52
-
-
MFT 5 books via Anastasia's Collectibles @ Comikaze
Received: 11/11
Verified: 11/18
Scheduled for grading: 12/3
Graded: 12/5
Graded/QC: 12/10
Shipped: 12/10
MFT 6 books via Anastasia's Collectibles @ Comikaze (Currently with CCS)
Received: ??/??
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
Moved to verified today (11/18). Only took them 5 business days to do that. Based on their SLA of 15 days MFT, they're not going to make it to Shipped.
Still waiting for my grades as they are not in the system yet. CGC needs to update their SLA on their site. Am I the only one that's feeling the pain here for MFT?
CCS is so behind! They haven't even got to my books even though it's Fast Track.
Graded/QC and Shipped Safe all completed today. Happy with my grades, but not happy with the turnaround time. Almost took them a month (calendar days) to get it all done when received on 11/11. Oh well! I hope they arrive safely.
And still waiting on my CCS books to move to CGC, but that's a whole other story... Sheesh.
-
MFT 5 books via Anastasia's Collectibles @ Comikaze
Received: 11/11
Verified: 11/18
Scheduled for grading: 12/3
Graded: 12/5
Graded/QC: ??/??
Shipped: ??/??
MFT 6 books via Anastasia's Collectibles @ Comikaze (Currently with CCS)
Received: ??/??
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
Moved to verified today (11/18). Only took them 5 business days to do that. Based on their SLA of 15 days MFT, they're not going to make it to Shipped.
Still waiting for my grades as they are not in the system yet. CGC needs to update their SLA on their site. Am I the only one that's feeling the pain here for MFT?
CCS is so behind! They haven't even got to my books even though it's Fast Track.
-
11/11 Received and finally moved to Scheduled to Grading today (12/5). Total of 13 business days and their SLA on their site states 15 for MFT. I don't see that happening.
today is the 4th?
Whoops... Damn my PHAT fingers... 12/3 - Scheduled for Grading.
-
11/11 Received and finally moved to Scheduled to Grading today (12/5). Total of 13 business days and their SLA on their site states 15 for MFT. I don't see that happening.
-
MFT 5 books via Anastasia's Collectibles @ Comikaze
Received: 11/11
Verified: 11/18
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
MFT 6 books via Anastasia's Collectibles @ Comikaze (Currently with CCS)
Received: ??/??
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
Moved to verified today (11/18). Only took them 5 business days to do that. Based on their SLA of 15 days MFT, they're not going to make it to Shipped.
Still in verified status with the holiday coming up.
-
MFT 5 books via Anastasia's Collectibles @ Comikaze
Received: 11/11
Verified: 11/18
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
MFT 6 books via Anastasia's Collectibles @ Comikaze (Currently with CCS)
Received: ??/??
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
Moved to verified today (11/18). Only took them 5 business days to do that. Based on their SLA of 15 days MFT, they're not going to make it to Shipped.
-
MFT 5 books via Anastasia's Collectibles @ Comikaze
Received: 11/11
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
MFT 6 books via Anastasia's Collectibles @ Comikaze (Currently with CCS)
Received: ??/??
Verified: ??/??
Scheduled for grading: ??/??
Graded: ??/??
Graded/QC: ??/??
Shipped: ??/??
-
Not mine...
Looks like Spider Gwen is still en Fuego!
Regular Cover
http://www.ebay.com/itm/151460643755?ssPageName=STRK:MESELX:IT&_trksid=p3984.m1555.l2649
Variant Cover
http://www.ebay.com/itm/151460672913?ssPageName=STRK:MESELX:IT&_trksid=p3984.m1555.l2649
I wonder why the regular is out pacing the variant.
Not sure but I am thinking the ASM 9 Comicxposure variant is going to be red hot very soon. Its Spider-Gwen's second appearance, first appearance in the 616 and has her on the cover along with Silk & Spider-woman.
Do you know what it is limited to?
-
Not mine...
Looks like Spider Gwen is still en Fuego!
Regular Cover
http://www.ebay.com/itm/151460643755?ssPageName=STRK:MESELX:IT&_trksid=p3984.m1555.l2649
Variant Cover
http://www.ebay.com/itm/151460672913?ssPageName=STRK:MESELX:IT&_trksid=p3984.m1555.l2649
I wonder why the regular is out pacing the variant.
-
Modern Fast Track all Sig Series (23 books):
10/3 => Received
10/10 => Verified
10/16 => Scheduled for Grading
10/30 => Graded
10/30 => QC
11/03 => Shipped
Modern Fast Track via CCS all Sig Series (6 books):
10/3 => Received by CCS
10/14 => Completed by CCS
10/15 => Received by CGC
10/16 => Verified
10/22 => Scheduled for Grading
10/30 => Graded
10/30 => QC
10/30 => Shipped
My MFTs, finally shipped. Can't wait to get them?!
Now, let's see how long it takes CGC to receive my books via Anastasia Comics from Comikaze!
-
Thanks JKing!
-
-
Modern Fast Track all Sig Series (23 books):
10/3 => Received
10/10 => Verified
10/16 => Scheduled for Grading
10/30 => Graded
10/30 => QC
??/?? => Shipped
Modern Fast Track via CCS all Sig Series (6 books):
10/3 => Received by CCS
10/14 => Completed by CCS
10/15 => Received by CGC
10/16 => Verified
10/22 => Scheduled for Grading
10/30 => Graded
10/30 => QC
10/30 => Shipped
Books went to Graded yesterday.
The ones via CCS shipped yesterday. So, how's that possible? Just my dumb luck I guess.
-
Still waiting for my 10/3 MFT books to be graded. What did you guys do to get your books done so quickly?
-
update
MFT #1 - rec ? > ver 2/18 > sch 2/27 > grd 2/28 > grd/QC 3/12 > shipped 3/13
MFT #2 - rec 2/24 > ver 2/26 > sch 3/5 > grd 3/10 > grd/QC 3/18 > shipped 3/20
Modern - rec 2/24 > ver 2/26>sch3/19>grd 4/1>grd/qc 4/16>shipped 4/17
MFT #3 - rec 4/3>ver 4/9>sch 4/16>grd 4/18>grd/QC 4/24>shipped 4/25
Value FT #1 - rec 4/7>verified 4/16>sch 5/7>grd 5/12> grd/qc 5/17>shipped 5/19
Coupon - rec 5/19 > ver 5/20>sch 6/2>grd 6/3 >grd/QC 6/5>shipped
MFT#3 - rec 6/16>ver?>sch 6/30>graded 7/1>grd/qc 7/3>shipped 7/10
MAGEXP#1 - rec 7/3>ver 7/7>sch 7/7>grd 7/9>grd/qc 7/17>shipped 7/17
MFT#4 - rec 7/3>ver 7/8>sch 7/16>graded 7/17>grd/qc 7/21>shipped 7/22
Express - rec 7/7>ver 7/7>scheduled 7/7>grd 7/9>grd/qc 7/11>shipped 7/14
EFT#1 - rec 6/16>ver 6/17>sch 7/16>graded 7/21>grd/qc 7/29>>shipped? can't remember
ModernSlow - rec 7/7>ver 8/15>sch 8/25>grd 8/27>grd/qc 9/10>shipped 10/1
MFT#5 - rec 9/8>ver 9/11> sch 9/16>grd 9/16> grd/qc 9/20>shipped 9/22
New submission
MFT#6 - rec 10/3>ver 10/13>sch 10/16>grad 10/18>grd/qc 10/23>shipped 10/27
MFT#7 - rec 10/20
Shipped already? Our submissions came in around the same time and mine is still sitting on Scheduled for Grading. Again, I'm so jealous!!
#FIFO!
In this instance, I'm all about... #LIFO
-
update
MFT #1 - rec ? > ver 2/18 > sch 2/27 > grd 2/28 > grd/QC 3/12 > shipped 3/13
MFT #2 - rec 2/24 > ver 2/26 > sch 3/5 > grd 3/10 > grd/QC 3/18 > shipped 3/20
Modern - rec 2/24 > ver 2/26>sch3/19>grd 4/1>grd/qc 4/16>shipped 4/17
MFT #3 - rec 4/3>ver 4/9>sch 4/16>grd 4/18>grd/QC 4/24>shipped 4/25
Value FT #1 - rec 4/7>verified 4/16>sch 5/7>grd 5/12> grd/qc 5/17>shipped 5/19
Coupon - rec 5/19 > ver 5/20>sch 6/2>grd 6/3 >grd/QC 6/5>shipped
MFT#3 - rec 6/16>ver?>sch 6/30>graded 7/1>grd/qc 7/3>shipped 7/10
MAGEXP#1 - rec 7/3>ver 7/7>sch 7/7>grd 7/9>grd/qc 7/17>shipped 7/17
MFT#4 - rec 7/3>ver 7/8>sch 7/16>graded 7/17>grd/qc 7/21>shipped 7/22
Express - rec 7/7>ver 7/7>scheduled 7/7>grd 7/9>grd/qc 7/11>shipped 7/14
EFT#1 - rec 6/16>ver 6/17>sch 7/16>graded 7/21>grd/qc 7/29>>shipped? can't remember
ModernSlow - rec 7/7>ver 8/15>sch 8/25>grd 8/27>grd/qc 9/10>shipped 10/1
MFT#5 - rec 9/8>ver 9/11> sch 9/16>grd 9/16> grd/qc 9/20>shipped 9/22
New submission
MFT#6 - rec 10/3>ver 10/13>sch 10/16>grad 10/18>grd/qc 10/23>shipped 10/27
MFT#7 - rec 10/20
Shipped already? Our submissions came in around the same time and mine is still sitting on Scheduled for Grading. Again, I'm so jealous!!
-
Modern Fast Track all Sig Series (23 books):
10/3 => Received
10/10 => Verified
10/16 => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
Modern Fast Track via CCS all Sig Series (6 books):
10/3 => Received by CCS
10/14 => Completed by CCS
10/15 => Received by CGC
10/16 => Verified
10/22 => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
Books via CCS have moved from Verified to Scheduled for Grading today (10/22). Things seem to be moving accordingly. WooHoo!
-
it's possible that yours will change today or tomorrow
Looks like it just changed... YAY!!
Modern Fast Track all Sig Series (23 books):
10/3 => Received
10/10 => Verified
10/16 => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
Modern Fast Track via CCS all Sig Series (6 books):
10/3 => Received by CCS
10/14 => Completed by CCS
10/15 => Received by CGC
10/16 => Verified
??/?? => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
-
update
MFT #1 - rec ? > ver 2/18 > sch 2/27 > grd 2/28 > grd/QC 3/12 > shipped 3/13
MFT #2 - rec 2/24 > ver 2/26 > sch 3/5 > grd 3/10 > grd/QC 3/18 > shipped 3/20
Modern - rec 2/24 > ver 2/26>sch3/19>grd 4/1>grd/qc 4/16>shipped 4/17
MFT #3 - rec 4/3>ver 4/9>sch 4/16>grd 4/18>grd/QC 4/24>shipped 4/25
Value FT #1 - rec 4/7>verified 4/16>sch 5/7>grd 5/12> grd/qc 5/17>shipped 5/19
Coupon - rec 5/19 > ver 5/20>sch 6/2>grd 6/3 >grd/QC 6/5>shipped
MFT#3 - rec 6/16>ver?>sch 6/30>graded 7/1>grd/qc 7/3>shipped 7/10
MAGEXP#1 - rec 7/3>ver 7/7>sch 7/7>grd 7/9>grd/qc 7/17>shipped 7/17
MFT#4 - rec 7/3>ver 7/8>sch 7/16>graded 7/17>grd/qc 7/21>shipped 7/22
Express - rec 7/7>ver 7/7>scheduled 7/7>grd 7/9>grd/qc 7/11>shipped 7/14
EFT#1 - rec 6/16>ver 6/17>sch 7/16>graded 7/21>grd/qc 7/29>>shipped? can't remember
ModernSlow - rec 7/7>ver 8/15>sch 8/25>grd 8/27>grd/qc 9/10>shipped 10/1
MFT#5 - rec 9/8>ver 9/11> sch 9/16>grd 9/16> grd/qc 9/20>shipped 9/22
New submission
MFT#6 - rec 10/3>ver 10/13>scheduled for grading 10/16
I'm jealous! We submitted our books at the same time and mine are still in Verified.
-
Items submitted @ LBCC
Modern Fast Track all Sig Series:
10/3 => Received
10/10 => Verified
??/?? => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
Modern Fast Track via CCS all Sig Series:
10/3 => Received by CCS
10/14 => Completed by CCS
10/15 => Received by CGC
??/?? => Verified
??/?? => Scheduled for Grading
??/?? => Graded
??/?? => QC
??/?? => Shipped
-
-
Long Beach Comic Expo ended June 1
Received: 6/5
Verified: 6/10
Scheduled for Grading: 6/24
Graded: 6/25
Shipped: 7/1
Received: 7/9
I have another set from Long Beach via CCS
Modern Fast Track
Received: 6/27
Verified: 6/30
Scheduled for Grading: 7/15
Graded: 7/16
Shipped: ?
Still in Verified. I hope these get graded soon as SDCC is coming up and they're going to be swamped with books.
SDCC will actually help your cause. They'll be itching to get to the SDCC pile. I'd be more worried about the b2b on site grading.
Thanks Branget! Looks like you were right. Books went from Scheduled for Grading to Graded in 1 day. Updated the dates above.
-
Long Beach Comic Expo ended June 1
Received: 6/5
Verified: 6/10
Scheduled for Grading: 6/24
Graded: 6/25
Shipped: 7/1
Received: 7/9
I have another set from Long Beach via CCS
Modern Fast Track
Received: 6/27
Verified: 6/30
Scheduled for Grading: ?
Graded: ?
Shipped: ?
Still in Verified. I hope these get graded soon as SDCC is coming up and they're going to be swamped with books.
-
Long Beach Comic Expo ended June 1
Received: 6/5
Verified: 6/10
Scheduled for Grading: 6/24
Graded: 6/25
Shipped: 7/1
Well, things are moving forward. Let's see how long it takes in the "Graded" state.
FYI, grades haven't been listed yet.
Items shipped today on the site. Have yet to receive confirmation/tracking number today, but I'm please with the grades I received.
I have another set from Long Beach via CCS
Modern Fast Track
Received: 6/27
Verified: 6/30
Scheduled for Grading: ?
Graded: ?
Shipped: ?
current turn around rates at CGC
in Comics General
Posted
@ Jsilverjanet - You're right, 15 days vs. 20 days isn't bad. But when you're trying to either move things 5 days matter. Also, if they're telling me 15 days and the site is telling me 15 days, you're setting expectations right? So, I'm just a little disappointed.