• When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.

current turn around rates at CGC
79 79

26,969 posts in this topic

MST > Received: 5/15 > Verified: 6/10 > Scheduled for Grading: 6/18 > Graded: 7/02 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/15 *

 

MST > Received: 6/02 > Verified: 7/01 > Scheduled for Grading: 7/10 > Graded: 7/16 > Graded/Quality Control: Skipped > Shipped/Safe: 7/28 *

 

MFT > Received: 6/02 > Verified: 6/10 > Scheduled for Grading: 6/16 > Graded: 6/23 > Graded/Quality Control: 6/26 > Shipped/Safe: 6/30 *

 

MST > Received: 6/25 > Verified: 7/30 > Scheduled for Grading: 8/25 > Graded: 8/26 > Grading/Quality Control: 9/8 >

 

MST > Received: 6/26 > Verified: 8/05 > Scheduled for Grading: 8/08 > Graded: 8/08 > Grading/Quality Control: 8/13 > Shipped/Safe: 8/19 *

 

MFT > Received: 6/25 > Verified: 6/30 > Scheduled for Grading: 7/08 > Graded: 7/11 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/17 *

 

MFT > Received: 7/14 > Verified: 7/15 > Scheduled for Grading: 7/21 > Graded: 7/23 > Graded/Quality Control: 7/30 > Shipped/Safe: 8/01 *

 

MFT > Received: 7/17 > Verified: 7/18 > Scheduled for Grading: 7/29 > Graded: 7/30 > Grading/Quality Control: 7/31 > Shipped/Safe: 8/4 *

 

MST > Received: 8/04 >

 

MST > Received: 8/05 >

 

MST > Received: 8/05 >

 

MST > Received: 8/06 >

 

MFT (Pre-Screen) > Received: 8/27 > Verified: 9/09 > Scheduled for Grading: 9/10

 

MFT > Received: 9/05

 

 

Link to comment
Share on other sites

MST 1 Prescreen 9.8 rcvd: May 12-SFG (June 26) Graded (July 18) @ Shipped July 28

MST 2 Prescreen 9.4 rcvd: May 12-SFG (July 8) Graded (July 14) Q/C (July 23) @ Shipped (July 25)

MST 3 Prescreen 9.8 rcvd: June 27 Verified (Aug 28) SFG (Sept 3) Graded (Sept 3) @Q/C (Sept 10)

MST 4 rcvd: June 27 verified Aug 5 graded (not sure when exactly between Aug 8-14 as I was away). @shipped on Aug 21

MST 5 Prescreen 9.8 rcvd: July 3 verified (Aug 29) SFG (Sept 8) @ Graded (Sept 9)

Econ1 rcvd: Aug 1

MST 6 Prescreen rcvd: Aug 1

MST 7 Prescreen rcvd: Aug 1

MST 8 Prescreen rcvd: Aug 1

MST 9 Prescreen rcvd: Aug 1

MST 10 Prescreen rcvd: Aug 1

Econ2 rcvd: Aug 1

Standard1 rcvd: Aug 4, Verified (Aug 4) graded btwn Aug18-22 @shipped Aug 25

Link to comment
Share on other sites

MST > Received: 5/15 > Verified: 6/10 > Scheduled for Grading: 6/18 > Graded: 7/02 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/15 *

 

MST > Received: 6/02 > Verified: 7/01 > Scheduled for Grading: 7/10 > Graded: 7/16 > Graded/Quality Control: Skipped > Shipped/Safe: 7/28 *

 

MFT > Received: 6/02 > Verified: 6/10 > Scheduled for Grading: 6/16 > Graded: 6/23 > Graded/Quality Control: 6/26 > Shipped/Safe: 6/30 *

 

MST > Received: 6/25 > Verified: 7/30 > Scheduled for Grading: 8/25 > Graded: 8/26 > Grading/Quality Control: 9/8 >

 

MST > Received: 6/26 > Verified: 8/05 > Scheduled for Grading: 8/08 > Graded: 8/08 > Grading/Quality Control: 8/13 > Shipped/Safe: 8/19 *

 

MFT > Received: 6/25 > Verified: 6/30 > Scheduled for Grading: 7/08 > Graded: 7/11 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/17 *

 

MFT > Received: 7/14 > Verified: 7/15 > Scheduled for Grading: 7/21 > Graded: 7/23 > Graded/Quality Control: 7/30 > Shipped/Safe: 8/01 *

 

MFT > Received: 7/17 > Verified: 7/18 > Scheduled for Grading: 7/29 > Graded: 7/30 > Grading/Quality Control: 7/31 > Shipped/Safe: 8/4 *

 

MST > Received: 8/04 >

 

MST > Received: 8/05 >

 

MST > Received: 8/05 >

 

MST > Received: 8/06 >

 

MFT (Pre-Screen) > Received: 8/27 > Verified: 9/09 > Scheduled for Grading: 9/10 > Graded: 9/11 >

 

MFT > Received: 9/05

 

 

:headbang: Only 2 books missed 9.8

 

Link to comment
Share on other sites

Modern Slow Track (15 books)

Received 8/04

 

Economy Magazine (3 books)

Received 8/04

Verified 8/06

Scheduled for Grading 9/03

 

Standard (1 book)

Received 8/22

Verified 8/25

Scheduled for Grading 9/11

 

Economy Fast Track (8 books)

Received 9/08

Link to comment
Share on other sites

 

MST > Received: 5/15 > Verified: 6/10 > Scheduled for Grading: 6/18 > Graded: 7/02 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/15 *

 

MST > Received: 6/02 > Verified: 7/01 > Scheduled for Grading: 7/10 > Graded: 7/16 > Graded/Quality Control: Skipped > Shipped/Safe: 7/28 *

 

MFT > Received: 6/02 > Verified: 6/10 > Scheduled for Grading: 6/16 > Graded: 6/23 > Graded/Quality Control: 6/26 > Shipped/Safe: 6/30 *

 

MST > Received: 6/25 > Verified: 7/30 > Scheduled for Grading: 8/25 > Graded: 8/26 > Grading/Quality Control: 9/8 >

 

MST > Received: 6/26 > Verified: 8/05 > Scheduled for Grading: 8/08 > Graded: 8/08 > Grading/Quality Control: 8/13 > Shipped/Safe: 8/19 *

 

MFT > Received: 6/25 > Verified: 6/30 > Scheduled for Grading: 7/08 > Graded: 7/11 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/17 *

 

MFT > Received: 7/14 > Verified: 7/15 > Scheduled for Grading: 7/21 > Graded: 7/23 > Graded/Quality Control: 7/30 > Shipped/Safe: 8/01 *

 

MFT > Received: 7/17 > Verified: 7/18 > Scheduled for Grading: 7/29 > Graded: 7/30 > Grading/Quality Control: 7/31 > Shipped/Safe: 8/4 *

 

MST > Received: 8/04 >

 

MST > Received: 8/05 >

 

MST > Received: 8/05 >

 

MST > Received: 8/06 >

 

MFT (Pre-Screen) > Received: 8/27 > Verified: 9/09 > Scheduled for Grading: 9/10 > Graded: 9/11 >

 

MFT > Received: 9/05

 

 

:headbang: Only 2 books missed 9.8

 

 

Man they really want you to pay for fast track...takes your books just a a few weeks to go through, slow track is 2.5+ months.

Link to comment
Share on other sites

Modern Slow Track (15 books)

Received 8/04

 

Economy Magazine (3 books)

Received 8/04

Verified 8/06

Scheduled for Grading 9/03

 

Standard (1 book)

Received 8/22

Verified 8/25

Scheduled for Grading 9/11

 

Economy Fast Track (8 books)

Received 9/08

 

Not bad. It is better than three years ago (8 to 12 weeks waiting).

Link to comment
Share on other sites

Current Submission:

MFT: 8/1/14 - Verified 8/5/14- 8/12/14 Graded- 8/14 Graded/Quality Control- 8/15 Shipped/Safe

MST: 8/1/14 Received

Magazine: 8/1/14 - Verified 8/5/14- Sch for grading 9/3

EFT: 8/1/14 - Verified 8/5/14- sch. for grading 8/27 - graded 9/3

EFT: 8/5/14 Received- Verified 8/12/14- 8/28 Scheduled for grading

MFT SS 8/5/14 Received - Graded 8/19/14 - Graded/QC Limbo 8/22/14- 8/27 shipped/safe

EFT SS 8/5/14 Received - 8/28 Scheduled for grading - Graded 9/3

 

No change in over a week. Hopefully they start picking up soon.

Link to comment
Share on other sites

 

Previous Submissions

 

MST > Received: 5/15 > Verified: 6/10 > Scheduled for Grading: 6/18 > Graded: 7/02 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/15 *

 

MST > Received: 6/02 > Verified: 7/01 > Scheduled for Grading: 7/10 > Graded: 7/16 > Graded/Quality Control: Skipped > Shipped/Safe: 7/28 *

 

MFT > Received: 6/02 > Verified: 6/10 > Scheduled for Grading: 6/16 > Graded: 6/23 > Graded/Quality Control: 6/26 > Shipped/Safe: 6/30 *

 

MST > Received: 6/26 > Verified: 8/05 > Scheduled for Grading: 8/08 > Graded: 8/08 > Grading/Quality Control: 8/13 > Shipped/Safe: 8/19 *

 

MFT > Received: 6/25 > Verified: 6/30 > Scheduled for Grading: 7/08 > Graded: 7/11 > Grading/Quality Control: 7/15 > Shipped/Safe: 7/17 *

 

MFT > Received: 7/14 > Verified: 7/15 > Scheduled for Grading: 7/21 > Graded: 7/23 > Graded/Quality Control: 7/30 > Shipped/Safe: 8/01 *

 

MFT > Received: 7/17 > Verified: 7/18 > Scheduled for Grading: 7/29 > Graded: 7/30 > Grading/Quality Control: 7/31 > Shipped/Safe: 8/4 *

 

 

MST > Received: 6/25 > Verified: 7/30 > Scheduled for Grading: 8/25 > Graded: 8/26 > Grading/Quality Control: 9/8 >

 

MST > Received: 8/04 >

 

MST > Received: 8/05 >

 

MST > Received: 8/05 >

 

MST > Received: 8/06 >

 

MFT (Pre-Screen) > Received: 8/27 > Verified: 9/09 > Scheduled for Grading: 9/10 > Graded: 9/11 >

 

MFT > Received: 9/05 > Verified: 9/12 >

 

Link to comment
Share on other sites

Modern Slow Track (15 books)

Received 8/04

 

Economy Magazine (3 books)

Received 8/04

Verified 8/06

Scheduled for Grading 9/03

Graded 9/12

 

Standard (1 book)

Received 8/22

Verified 8/25

Scheduled for Grading 9/11

 

Economy Fast Track (8 books)

Received 9/08

Link to comment
Share on other sites

Current Submission:

MFT: 8/1/14 - Verified 8/5/14- 8/12/14 Graded- 8/14 Graded/Quality Control- 8/15 Shipped/Safe

 

MST: 8/1/14 Received

 

Magazine: 8/1/14 - Verified 8/5/14- Sch for grading 9/3- 9/15 Graded

 

EFT: 8/1/14 - Verified 8/5/14- sch. for grading 8/27 - graded 9/3 - 9/15 Graded/QC

 

EFT: 8/5/14 Received- Verified 8/12/14- 8/28 Scheduled for grading- 9/15 Graded

 

MFT SS 8/5/14 Received - Graded 8/19/14 - Graded/QC Limbo 8/22/14- 8/27 shipped/safe

 

EFT SS 8/5/14 Received - 8/28 Scheduled for grading - Graded 9/3

 

 

Link to comment
Share on other sites

Economy - submitted at Wizard World Philly on 6/20. Didn't have my membership number so I can't check status online.

 

Called them Friday and was told "probably another three weeks."

 

On the plus side, at the con I also submitted a raw book to Comiclink to get slabbed before auction, & they've now received it. Graded exactly as expected.

 

Hard not to get excited to know how these books (my first CGC submission) grade & get them back in my grubby little mitts.

 

When I was 9 years old I remember collecting the necessary proofs of purchase from five Star Wars figures in order to send away for a free exclusive figure of The Emperor. Waited 4-6 weeks. This...this feels worse.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
79 79